Saturday, May 29, 2010

Handover Basics

Although the concept of cellular handover or cellular handoff is relatively straightforward, it is not an easy process to implement in reality. The cellular network needs to decide when handover or handoff is necessary, and to which cell. Also when the handover occurs it is necessary to re-route the call to the relevant base station along with changing the communication between the mobile and the base station to a new channel. All of this needs to be undertaken without any noticeable interruption to the call. The process is quite complicated, and in early systems calls were often lost if the process did not work correctly.

Different cellular standards handle hand over / handoff in slightly different ways. Therefore for the sake of an explanation the example of the way that GSM handles handover is given.

There are a number of parameters that need to be known to determine whether a handover is required. The signal strength of the base station with which communication is being made, along with the signal strengths of the surrounding stations. Additionally the availability of channels also needs to be known. The mobile is obviously best suited to monitor the strength of the base stations, but only the cellular network knows the status of channel availability and the network makes the decision about when the handover is to take place and to which channel of which cell.

Accordingly the mobile continually monitors the signal strengths of the base stations it can hear, including the one it is currently using, and it feeds this information back. When the strength of the signal from the base station that the mobile is using starts to fall to a level where action needs to be taken the cellular network looks at the reported strength of the signals from other cells reported by the mobile. It then checks for channel availability, and if one is available it informs this new cell to reserve a channel for the incoming mobile. When ready, the current base station passes the information for the new channel to the mobile, which then makes the change. Once there the mobile sends a message on the new channel to inform the network it has arrived. If this message is successfully sent and received then the network shuts down communication with the mobile on the old channel, freeing it up for other users, and all communication takes place on the new channel.

Under some circumstances such as when one base transceiver station is nearing its capacity, the network may decide to hand some mobiles over to another base transceiver station they are receiving that has more capacity, and in this way reduce the load on the base transceiver station that is nearly running to capacity. In this way access can be opened to the maximum number of users. In fact channel usage and capacity are very important factors in the design of a cellular network.

No comments: